10 Steps to Cost Effective & Safe Installation of Instrumentation Tube and Fittings Systems – Part 2

 

Here is the second part provided from Parker Hannifin to help ensure your instrumentation tube and fittings system is as safe as possible.

Step 6 – Material Selection

Choice of the correct material based on corrosion resistance, process fluid, temperature and cost is essential. This can be discussed with the Parker team, including a highly experienced Metallurgist, so the best solution is chosen. It is particularly critical when H2S is present within the process as this can exacerbate stress corrosion cracking.

Mixing of materials can exacerbate corrosion or reduce the longevity of the system. When this is the only available option then consideration must be given to their differing temperature and pressure ratings and how these will impact on the integrity of the system.

The material and positioning of tubing clamps should be well considered during a design to ensure that the clamps themselves are corrosion resistant, cause no abrasion to the tube and are positioned such that water is free draining.

 

Step 7 – Fugitive Emissions

When project applications require the use of FE (Fugitive Emission) valves, the customer should ensure that the requirement for TAMAP 2 is written into the specification at an early stage.

H2S can cause embrittlement and therefore single piece valves, which avoid the use of welded connections, such as Parkers range of FE valves, will provide added security within the system.

Designs where fugitive emissions are critical need additional consideration with respect to the reduction of potential leak paths, again integral fitting technology removes both NPT connections, which are subject to stress corrosion cracking and embrittlement within the threads.

Step 8 – Material Storage

The correct handling and storage of tube prior to installation is important. If the tube is stored externally or dragged around, it may harm the integrity of the product. The tube may pick up water and contamination/corrosion, scratches and even lose its roundness and become oval. Tube should be stored inside, off the floor, on racks to remove all these potential issues. The system should be dry air purged prior to connection to any sensitive equipment.

Step 9 – Installation

Tube Cutting, Deburring and Control

The tube should be cut with a sharply bladed hacksaw and the material of the blade should be of high quality. Cutting should be carried out in a sawing vice – it is recommended to use a specific tube cutter. The best advice is to remove any visible burrs inside and out using a tube deburring tool. Wipe clean when the cut is complete and make sure no swarf has entered the tube by cleaning with dry air. Parker can supply pre-cut tube lengths if required.

Tube Benders

Tube benders should be procured from the fittings manufacturer to ensure high bending quality and accuracy. The tube bender should be of 316SS material because carbon steel tube benders are likely to leave a residue of material on harder tube compounds, which is likely be a starting point for corrosion.

A Gap Gauge should be used to check the correct installation of the tube into the fitting prior to final system testing.

Step 10 – Training

It is recommended that site installers undertake at least basic training on the installation of tube and fittings from a company approved by the fittings supplier. Parker Sales Companies and many of its local distributors worldwide can provide the Small Bore Tubing Expert (SBEx) training. This is now the norm in the North Sea, although lots of other regions have not yet implemented this. However, all end customers are underlining the importance of safety first.

This training covers both the theoretical and hands-on procedure for the correct installation of fittings and all connection aspects, as well as correct tube bending procedures. This comes with an accredited passport confirming that the person concerned has undertaken the training and it is still valid. This training is valid for 2 years and can be delivered by Parker approved trainers.

To find out more about Parker’s Effective & Safe Installation of Instrumentation Tube and Fittings Systems, please feel free to fill out the contact form and a member of KC Controls will be in contact with you.

6 + 13 =

*This blog was sourced from: http://blog.parker.com/10-steps-to-cost-effective-safe-installation-of-instrumentation-tube-and-fittings-systems-part-1 and all rights off the blog belong to Parker Hannifin

Latest News

Mark Robinson will run the London Marathon 2024

Mark Robinson will run the London Marathon 2024

Get ready to rally behind Mark Robinson as he gears up for the London Marathon in support of the incredible charity, Phab!   In case you're not familiar with Phab, they're all about inclusivity, bringing people together regardless of their abilities. With over 130...

NEW KC Controls Brochure

Exciting news! We've just released our new brochure showcasing our cutting-edge products and innovations. Inside, you'll find information on our world leading products, alongside information on the latest training on how our solutions can optimise your operations and...

What does a pressure transmitter do?

What does a pressure transmitter do?

A pressure transmitter is a mechanical device that measures the expansive force of a liquid or gaseous sample. Also known as a pressure transducer, this type of sensor is typically composed of a pressure sensitive surface area made of steel, silicon, or other...

Talk To Us Today

Speak to an expert within seconds about our extensive range of products and services.

Sign Up to our Newsletter

Make sure KC Controls can stay in touch with you and bring you all the latest News, Video Tutorials, Product Videos & Promotions plus many more.

Share This